Contact us

Hangar Rash?

Off-field landing?

Need low cost replacement parts?

545 Aviation Road

Oshkosh, WI 54902

(920) 231-9772

myersaviation@sbcglobal.net

This form does not yet contain any fields.
    Powered by Squarespace
    « Engine install and cowl fitting | Main | Firewall Fix »
    Thursday
    May172012

    Coming together

    The RV-9A is coming along nicely. The firewall with its new heater plenum for cold Wisconsin winters has been riveted in place with a few other items hanging on as well. The new engine mount/nose gear assembly is installed and the through-the-firewall wiring is pulled and ready to mate to the engine. 

    Speaking of engine, the overhauled Lycoming O-320 with factory new cylinders and pistons is nearly ready to install.

    The final piece of the airframe repair is the canopy. The rear glass is in and the main canopy is being fit to the frame.

    Reader Comments

    There are no comments for this journal entry. To create a new comment, use the form below.

    PostPost a New Comment

    Enter your information below to add a new comment.

    My response is on my own website »
    Author Email (optional):
    Author URL (optional):
    Post:
     
    Some HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>